No plumber today though. Which is shit. No hot water still. And that's getting a bit boring now. (Plumber just turned up, apparently... I doubt he'll be done today as he has to replace a whole load of gas piping as well as run some mains to the new boiler and fit it.)
New chimney pot today though. And it matches, though it meant that the roofer had to drive to Cambridge to get a matching one.
The loft is really looking like a room now. It even has a door, skirting boards, windows that open and close. No lights yet though. The new bathroom has lots of pipes, not much floor...
