« Budapest | Main | Steels »

Buildage

The scaffolding is up and doesn't look too scary. What was really lovely was that when I got home, the lounge and hall had been meticulously vacuumed; to a much cleaner state than when I'd left the house in the morning. And despite the dust sheets we'd put over things in the 2nd bedroom (soon to be the 3rd bedroom), there was an extra, large, plastic sheet thrown over as well.

A good start.

The skip arrives today and the new steel goes in across the ceiling of the 2nd (3rd) bedroom and across the landing outside the main bedroom. This is going to make sure we get 2m height in the new bedroom in the loft. 6 weeks to go, though it could be as many as 8 and there's no movement on the 2nd part of the project; moving the bathroom from the ground floor behind the kitchen to the current 3rd bedroom. No pre-meeting for that yet.

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About

This page contains a single entry from the blog posted on August 7, 2007 7:29 AM.

The previous post in this blog was Budapest.

The next post in this blog is Steels.

Many more can be found on the main index page or by looking through the archives.

Creative Commons License
This weblog is licensed under a Creative Commons License.
Powered by
Movable Type 3.35